CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316
Material 4100040242 · CONNECTOR · Plant 1000
ATransferCriticalStockout
- Material
- 4100040242
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 29 d · P80 38 d
- Unit price
- Rp 71,206
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 1 is at or below the reorder point: 1 needed.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
- 6.Identical part 4100040931 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Single sourceOpen POSame description as 13 other material numbers
On hand / on order
0 / 1
next delivery 25 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 71,206
PO history
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 35 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 151.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 6 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1543 TEMPERATURE | A | 1 | 0 | 0.01 |
| PY_LIT-1742A-50A PP-448 LEVEL | A | 1 | 0 | 0.03 |
| PX_FIT-1732A HE-1774A INLET FLOW | B | 1 | 0 | 0.04 |
| PX_TEL-652 TEMPERATURE | B | 1 | 0 | 0.01 |
| PX_LIT-1681C-47B LEVEL | C | 1 | 0 | 0.03 |
| PX_LIT-385A-1 LEVEL | C | 1 | 0 | 0.03 |
Lead time and procurement
Lead time 29 ± 15 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Sept 2026 | PR03 Regular replenishment | 1 | Rp 68,950 | 25 Oct 2026 open | 38 d |
| 20 Aug 2026 | PR03 Regular replenishment | 2 | Rp 71,206 | 26 Sept 2026 | 37 d |
| 04 Aug 2026 | PR06 Regular replenishment | 1 | Rp 71,322 | 15 Aug 2026 | 11 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Aug 2026 | 1 | 201000002052 | Corrective |