CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316

Material 4100040262 · CONNECTOR · Plant 1000

AReduceSlow-moving
Material
4100040262
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 11 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
23 d · P80 43 d
Unit price
Rp 78,056

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 67 exceeds the level to keep (3) by 64.
  • 5.Installed on 11 FuncLoc(s), 5 of them criticality A/B.
Single sourceSame description as 16 other material numbers
On hand / on order
67 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 78,056
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 304 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 221.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 11 functional locations

5 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
UT_LIT-699-53
LEVEL
A110.03
PX_FIT-1092-12B
CONDENSATE FLOW
B100.04
PX_LIT-1560
KC-372D LEVEL
B100.03
PX_PIT-1119A
C4 PRODUCT PRESSURE
B100.04
PX_TEL-1895
TEMPERATURE
B100.01
PX_FIT-682B
LUBE OIL FLOW
C110.04
PX_PGI-430D-46
PP-225A BTM
C110.44
PX_FIT-1227-47A
FLOW
C100.04
PX_FIT-235D-57A
HE-955C INLET FLOW
C100.04
PX_TEL-706A
CRACKED GAS OUTLET BF-109
C100.01
PX_FIT-1274A
C4 PRODUCT FLOW
S100.04

Lead time and procurement

Lead time 23 ± 16 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
10 Jan 2026PR03
Regular replenishment
1Rp 79,78620 Jan 202610 d
28 Dec 2025PR03
Regular replenishment
2Rp 76,32616 Jan 202619 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Jul 2025MediumPX_PGI-430D-46Inspection PGI-430D-46.ok
30 May 2025LowPX_FIT-682BLeak from packing
27 May 2025MediumUT_LIT-699-53AR25/tranmsitter low performance

Recent goods issues

Posting dateQtyOrderOrder type
01 Dec 20251201000033772Corrective
24 Jun 20251201000006217Corrective
23 Jun 20251201000006217Corrective