CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316
Material 4100040262 · CONNECTOR · Plant 1000
AReduceSlow-moving
- Material
- 4100040262
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 11 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 23 d · P80 43 d
- Unit price
- Rp 78,056
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 67 exceeds the level to keep (3) by 64.
- 5.Installed on 11 FuncLoc(s), 5 of them criticality A/B.
Single sourceSame description as 16 other material numbers
On hand / on order
67 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 78,056
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 304 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 221.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 11 functional locations
5 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| UT_LIT-699-53 LEVEL | A | 1 | 1 | 0.03 |
| PX_FIT-1092-12B CONDENSATE FLOW | B | 1 | 0 | 0.04 |
| PX_LIT-1560 KC-372D LEVEL | B | 1 | 0 | 0.03 |
| PX_PIT-1119A C4 PRODUCT PRESSURE | B | 1 | 0 | 0.04 |
| PX_TEL-1895 TEMPERATURE | B | 1 | 0 | 0.01 |
| PX_FIT-682B LUBE OIL FLOW | C | 1 | 1 | 0.04 |
| PX_PGI-430D-46 PP-225A BTM | C | 1 | 1 | 0.44 |
| PX_FIT-1227-47A FLOW | C | 1 | 0 | 0.04 |
| PX_FIT-235D-57A HE-955C INLET FLOW | C | 1 | 0 | 0.04 |
| PX_TEL-706A CRACKED GAS OUTLET BF-109 | C | 1 | 0 | 0.01 |
| PX_FIT-1274A C4 PRODUCT FLOW | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 23 ± 16 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Jan 2026 | PR03 Regular replenishment | 1 | Rp 79,786 | 20 Jan 2026 | 10 d |
| 28 Dec 2025 | PR03 Regular replenishment | 2 | Rp 76,326 | 16 Jan 2026 | 19 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Jul 2025 | Medium | PX_PGI-430D-46 | Inspection PGI-430D-46.ok |
| 30 May 2025 | Low | PX_FIT-682B | Leak from packing |
| 27 May 2025 | Medium | UT_LIT-699-53 | AR25/tranmsitter low performance |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Dec 2025 | 1 | 201000033772 | Corrective |
| 24 Jun 2025 | 1 | 201000006217 | Corrective |
| 23 Jun 2025 | 1 | 201000006217 | Corrective |