CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316
Material 4100040353 · CONNECTOR · Plant 1000
AReduceSlow-moving
- Material
- 4100040353
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 5 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 32 d · P80 43 d
- Unit price
- Rp 65,007
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~32 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 4 exceeds the level to keep (2) by 2.
- 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Single sourceOpen POSame description as 19 other material numbers
On hand / on order
4 / 2
next delivery 21 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 65,007
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 248 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 70.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 5 functional locations
5 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TIT-1852B-18A CL-159 TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_LIT-1023-50A PP-1373A LEVEL | B | 1 | 0 | 0.03 |
| PX_PGI-266 KC-536A BTM | B | 1 | 0 | 0.02 |
| PX_TEL-1920-44B TEMPERATURE | B | 1 | 0 | 0.01 |
| PX_TEL-766-46A HE-410D BTM | B | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 32 ± 16 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Sept 2026 | PR03 Regular replenishment | 2 | Rp 64,495 | 21 Oct 2026 open | 38 d |
| 03 Aug 2025 | PR03 Regular replenishment | 2 | Rp 65,518 | 05 Sept 2025 | 33 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jan 2026 | 1 | 201000018534 | Corrective |