CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316

Material 4100040438 · CONNECTOR · Plant 1000

BMaintainHealthy
Material
4100040438
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
DUTA MANDIRI MAKMUR PT
Lead time
34 d · P80 43 d
Unit price
Rp 104,339

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~34 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Single sourceSame description as 16 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 104,339
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 122 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 27.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~14 days.

Installed on 3 functional locations

1 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TIT-1251A
TEMPERATURE
B210.04
PX_LIT-1662
LEVEL
C110.03
PX_LIT-1225B-18A
PP-423A LEVEL
S300.03

Lead time and procurement

Lead time 34 ± 16 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
28 Feb 2026PR04
Regular (other)
2Rp 104,33919 Apr 202650 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 May 2025MediumPX_LIT-1662Install scaffolding at LIT-1662
02 May 2025LowPX_TIT-1251ACheck TIT-1251A.ok

Recent goods issues

Posting dateQtyOrderOrder type
01 Jun 20261201000022564Corrective