CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316
Material 4100040502 · CONNECTOR · Plant 1000
ATransferCriticalStockout
- Material
- 4100040502
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 5 FuncLocs A/B)
- Supplier
- PRIMA INDUSTRI SENTOSA PT
- Lead time
- 47 d · P80 73 d
- Unit price
- Rp 50,738
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~47 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: 2 needed.
- 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
- 6.Identical part 4100039984 holds spare stock: transfer 2 EA instead of buying — no purchase needed.
Single sourceSame description as 19 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 4%
Unit price
Rp 50,738
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 99.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 5 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PGI-1763B VD-706A SUCTION | A | 1 | 1 | 0.02 |
| PX_PGI-683 VD-422 SUCTION | B | 1 | 0 | 0.02 |
| PX_PIT-196A RICH AMINE PRESSURE | C | 1 | 1 | 0.04 |
| PX_PGI-1206D PRESSURE GAUGE | C | 1 | 0 | 0.02 |
| PX_TEL-143 TEMPERATURE | S | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 47 ± 15 days (PO history, 3 PO lines) · on-time 44%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Feb 2026 | PR03 Regular replenishment | 1 | Rp 50,738 | 17 Apr 2026 | 69 d |
| 07 Feb 2026 | PR03 Regular replenishment | 2 | Rp 50,494 | 24 Apr 2026 | 76 d |
| 16 Sept 2025 | PR06 Regular replenishment | 1 | Rp 52,833 | 05 Nov 2025 | 50 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 May 2025 | Medium | PX_PGI-1763B | Install scaffolding at PGI-1763B |
| 02 May 2025 | Medium | PX_PIT-196A | PIT-196A reading frozen |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 May 2026 | 1 | 201000023302 | Corrective |