Sparely
DU

CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316

Material 4100040502 · CONNECTOR · Plant 1000

ATransferCriticalStockout
Material
4100040502
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
47 d · P80 73 d
Unit price
Rp 50,738

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 2 needed.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100039984 holds spare stock: transfer 2 EA instead of buying — no purchase needed.
Single sourceSame description as 19 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 4%
Unit price
Rp 50,738
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 141 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 99.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 5 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1763B
VD-706A SUCTION
A110.02
PX_PGI-683
VD-422 SUCTION
B100.02
PX_PIT-196A
RICH AMINE PRESSURE
C110.04
PX_PGI-1206D
PRESSURE GAUGE
C100.02
PX_TEL-143
TEMPERATURE
S100.01

Lead time and procurement

Lead time 47 ± 15 days (PO history, 3 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
07 Feb 2026PR03
Regular replenishment
1Rp 50,73817 Apr 202669 d
07 Feb 2026PR03
Regular replenishment
2Rp 50,49424 Apr 202676 d
16 Sept 2025PR06
Regular replenishment
1Rp 52,83305 Nov 202550 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 May 2025MediumPX_PGI-1763BInstall scaffolding at PGI-1763B
02 May 2025MediumPX_PIT-196APIT-196A reading frozen

Recent goods issues

Posting dateQtyOrderOrder type
13 May 20261201000023302Corrective