CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316
Material 4100040663 · CONNECTOR · Plant 1000
ATransferNormalBelow reorder point
- Material
- 4100040663
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 43 d
- Unit price
- Rp 122,853 (est.)
Recommendation
- 1.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 2 + on order 0 is at or below the reorder point: 2 needed.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
- 6.Identical part 4100040262 holds spare stock: transfer 2 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 16 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 122,853
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 56 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 543.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LIT-1551A LEVEL | A | 1 | 2 | 0.46 |
| PX_FIT-728 WASH WATER FLOW | C | 1 | 4 | 0.47 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Sept 2026 | Medium | PX_FIT-728 | Leak from packing |
| 06 Aug 2026 | Medium | PX_FIT-728 | Install scaffolding at FIT-728 |
| 24 Dec 2025 | Low | PX_FIT-728 | Install scaffolding at FIT-728 |
| 03 Nov 2025 | Low | PX_LIT-1551A | Replace lamp as per PM finding |
| 21 May 2025 | Low | PX_LIT-1551A | LIT-1551A abnormal indication |
| 08 May 2025 | Medium | PX_FIT-728 | FIT-728 reading frozen |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Aug 2026 | 1 | 201000036260 | Corrective |
| 05 Aug 2026 | 1 | 201000036260 | Corrective |
| 25 May 2025 | 1 | 201000007741 | Corrective |