Sparely
DU

CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316

Material 4100040663 · CONNECTOR · Plant 1000

ATransferNormalBelow reorder point
Material
4100040663
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 43 d
Unit price
Rp 122,853 (est.)

Recommendation

  • 1.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: 2 needed.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100040262 holds spare stock: transfer 2 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 16 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 122,853
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 56 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 543.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-1551A
LEVEL
A120.46
PX_FIT-728
WASH WATER FLOW
C140.47

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_FIT-728Leak from packing
06 Aug 2026MediumPX_FIT-728Install scaffolding at FIT-728
24 Dec 2025LowPX_FIT-728Install scaffolding at FIT-728
03 Nov 2025LowPX_LIT-1551AReplace lamp as per PM finding
21 May 2025LowPX_LIT-1551ALIT-1551A abnormal indication
08 May 2025MediumPX_FIT-728FIT-728 reading frozen

Recent goods issues

Posting dateQtyOrderOrder type
06 Aug 20261201000036260Corrective
05 Aug 20261201000036260Corrective
25 May 20251201000007741Corrective