CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316

Material 4100040715 · CONNECTOR · Plant 1000

ATransferNormalSlow-moving
Material
4100040715
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
LANGIT MESINDO GLOBAL PT
Lead time
27 d · P80 33 d
Unit price
Rp 312,634

Recommendation

  • 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~27 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 5 needed.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100041066, 4100041587 holds spare stock: transfer 5 EA instead of buying — no purchase needed.
Single sourceSame description as 18 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 5%
Unit price
Rp 312,634
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 297 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 179.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1963B-50
HE-1756B PRESSURE
A110.47
PX_TEL-1871B
KC-422A OUTLET
B110.44
PX_DPT-779
PP-1716 DP
C100.06

Lead time and procurement

Lead time 27 ± 15 days (PO history, 3 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
05 Mar 2026PR06
Regular replenishment
2Rp 308,84525 Mar 202620 d
29 Oct 2025PR03
Regular replenishment
1Rp 314,17310 Dec 202542 d
26 Aug 2025PR06
Regular replenishment
2Rp 312,63409 Sept 202514 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Jul 2025MediumPX_PIT-1963B-50PIT-1963B-50 reading frozen
25 Jun 2025MediumPX_TEL-1871BInspection TEL-1871B.ok

Recent goods issues

Posting dateQtyOrderOrder type
08 Dec 20251201000003397Corrective
22 Jul 20253201000021062Corrective