CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316
Material 4100040715 · CONNECTOR · Plant 1000
ATransferNormalSlow-moving
- Material
- 4100040715
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- LANGIT MESINDO GLOBAL PT
- Lead time
- 27 d · P80 33 d
- Unit price
- Rp 312,634
Recommendation
- 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~27 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 1 + on order 0 is at or below the reorder point: 5 needed.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
- 6.Identical part 4100041066, 4100041587 holds spare stock: transfer 5 EA instead of buying — no purchase needed.
Single sourceSame description as 18 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 5%
Unit price
Rp 312,634
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 297 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 179.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-1963B-50 HE-1756B PRESSURE | A | 1 | 1 | 0.47 |
| PX_TEL-1871B KC-422A OUTLET | B | 1 | 1 | 0.44 |
| PX_DPT-779 PP-1716 DP | C | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 27 ± 15 days (PO history, 3 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Mar 2026 | PR06 Regular replenishment | 2 | Rp 308,845 | 25 Mar 2026 | 20 d |
| 29 Oct 2025 | PR03 Regular replenishment | 1 | Rp 314,173 | 10 Dec 2025 | 42 d |
| 26 Aug 2025 | PR06 Regular replenishment | 2 | Rp 312,634 | 09 Sept 2025 | 14 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Jul 2025 | Medium | PX_PIT-1963B-50 | PIT-1963B-50 reading frozen |
| 25 Jun 2025 | Medium | PX_TEL-1871B | Inspection TEL-1871B.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Dec 2025 | 1 | 201000003397 | Corrective |
| 22 Jul 2025 | 3 | 201000021062 | Corrective |