Sparely
DU

CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316

Material 4100040782 · CONNECTOR · Plant 1000

AReduceSlow-moving
Material
4100040782
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
DUTA MANDIRI MAKMUR PT
Lead time
31 d · P80 43 d
Unit price
Rp 91,730

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 3 exceeds the level to keep (2) by 1.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Single sourceSame description as 13 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 91,730
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 312 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 89.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1959A
HE-810A INLET FLOW
A120.47
PX_PIT-817
FUEL OIL PRESSURE
C100.04

Lead time and procurement

Lead time 31 ± 16 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
23 Nov 2025PR03
Regular replenishment
2Rp 91,73028 Dec 202535 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 May 2026MediumPX_FIT-1959AFIT-1959A reading frozen
31 May 2025MediumPX_FIT-1959AFIT-1959A abnormal indication

Recent goods issues

Posting dateQtyOrderOrder type
23 Nov 20251201000010115Corrective