CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316
Material 4100040797 · CONNECTOR · Plant 1000
ATransferNormalSlow-moving
- Material
- 4100040797
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- LANGIT MESINDO GLOBAL PT
- Lead time
- 23 d · P80 22 d
- Unit price
- Rp 475,959
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 1 + on order 0 is at or below the reorder point: 1 needed.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
- 6.Identical part 4100041587 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Single sourceSame description as 18 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 475,959
PO history
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 374 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 41.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 3 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-471 TEMPERATURE | A | 2 | 0 | 0.01 |
| PX_PGI-357-35A KC-538 DISCHARGE | B | 1 | 0 | 0.02 |
| PY_PGI-1527A PRESSURE GAUGE | B | 1 | 0 | 0.02 |
Lead time and procurement
Lead time 23 ± 10 days (PO history, 5 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Aug 2026 | PR03 Regular replenishment | 2 | Rp 452,581 | 11 Sept 2026 | 12 d |
| 20 Aug 2026 | PR03 Regular replenishment | 1 | Rp 476,050 | 08 Sept 2026 | 19 d |
| 22 Jul 2026 | PR03 Regular replenishment | 1 | Rp 453,163 | 22 Aug 2026 | 31 d |
| 14 Dec 2025 | PR06 Regular replenishment | 2 | Rp 480,479 | 30 Dec 2025 | 16 d |
| 04 Dec 2025 | PR03 Regular replenishment | 1 | Rp 475,959 | 24 Dec 2025 | 20 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Sept 2025 | 1 | 201000034151 | Corrective |