Sparely
DU

CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316

Material 4100040867 · CONNECTOR · Plant 1000

BTransferNormalSlow-moving
Material
4100040867
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 43 d
Unit price
Rp 122,853 (est.)

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: 1 needed.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100040262 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 16 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 122,853
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 384 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~14 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-1540
TEMPERATURE
B100.01
PX_DPT-1189-33B
PP-251A DP
C110.06
PX_LIT-1178A
HE-1569D LEVEL
S100.03

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 May 2025MediumPX_DPT-1189-33BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
12 Sept 20251201000022749Corrective