CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316
Material 4100040971 · CONNECTOR · Plant 1000
BMonitorSlow-moving
- Material
- 4100040971
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- SINAR SEJAHTERA LESTARI PT
- Lead time
- 32 d · P80 37 d
- Unit price
- Rp 191,205
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~32 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Single sourceSame description as 18 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 191,205
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 335 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 33.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~14 days.
Installed on 2 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-973B-2 PRESSURE | B | 1 | 0 | 0.04 |
| PX_TEL-1155 HE-1750C OUTLET | C | 3 | 0 | 0.01 |
Lead time and procurement
Lead time 32 ± 12 days (PO history, 4 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 Jul 2026 | PR03 Regular replenishment | 1 | Rp 186,264 | 28 Aug 2026 | 28 d |
| 27 Jul 2026 | PR03 Regular replenishment | 1 | Rp 189,798 | 27 Aug 2026 | 31 d |
| 09 Jul 2026 | PR06 Regular replenishment | 1 | Rp 192,612 | 07 Aug 2026 | 29 d |
| 30 Jun 2025 | PR03 Regular replenishment | 2 | Rp 194,892 | 15 Aug 2025 | 46 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 Oct 2025 | 1 | 201000009269 | Corrective |
| 30 Oct 2025 | 1 | 201000009269 | Corrective |