CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316
Material 4100041087 · CONNECTOR · Plant 1000
- Material
- 4100041087
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 43 d
- Unit price
- Rp 122,853 (est.)
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.A 97.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~14 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PGI-772 PRESSURE GAUGE | C | 1 | 0 | 0.02 |
| PX_PIT-1252 HE-1767 PRESSURE | C | 1 | 0 | 0.04 |
| PX_PIT-283D PP-1224A PRESSURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2025 | 2 | 201000019445 | Corrective |
| 05 Jun 2025 | 1 | 205000015233 | Other maintenance |