CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316

Material 4100041638 · CONNECTOR · Plant 1000

CMonitorSlow-moving
Material
4100041638
Category
CONNECTOR
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
SURYA ENERGI JAYA PT
Lead time
29 d · P80 43 d
Unit price
Rp 69,687

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single sourceSame description as 18 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
98.3%
stockout risk now 2%
Unit price
Rp 69,687
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 483 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~14 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PGI-1547
PP-140C BTM
C120.44

Lead time and procurement

Lead time 29 ± 16 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
05 Oct 2025PR03
Regular replenishment
1Rp 69,68704 Nov 202530 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Aug 2026LowPX_PGI-1547Replace lamp as per PM finding
28 May 2025MediumPX_PGI-1547Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
05 Jun 20252201000025479Corrective