CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316
Material 4100041668 · CONNECTOR · Plant 1000
CMaintainHealthy
- Material
- 4100041668
- Category
- CONNECTOR
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- SURYA PERKASA SENTOSA PT
- Lead time
- 21 d · P80 15 d
- Unit price
- Rp 543,703
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~21 days; expected demand during lead time 0.1.
- 3.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
Single sourceSame description as 16 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
98.3%
stockout risk now 0%
Unit price
Rp 543,703
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 158 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~14 days.
Installed on 1 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1303 VD-1210 BTM | C | 3 | 0 | 0.01 |
Lead time and procurement
Lead time 21 ± 10 days (PO history, 3 PO lines) · on-time 25%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Nov 2025 | PR06 Regular replenishment | 2 | Rp 558,681 | 06 Dec 2025 | 16 d |
| 15 Jul 2025 | PR03 Regular replenishment | 1 | Rp 529,831 | 29 Jul 2025 | 14 d |
| 17 May 2025 | PR03 Regular replenishment | 2 | Rp 543,703 | 26 May 2025 | 9 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Apr 2026 | 3 | 201000000645 | Corrective |