Sparely
DU

TUBING,TYPE HS18,NBR

Material 4100041746 · TUBING · Plant 1000

AReorderNormalBelow reorder point
Material
4100041746
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
A (12 of 40 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
32 d · P80 36 d
Unit price
Rp 452,501

Recommendation

  • 1.Forecast 228 M/year: 228 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~32 days; expected demand during lead time 20.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 152, order up to 239.
  • 4.On hand 135 + on order 0 is at or below the reorder point: order 104 now.
  • 5.Installed on 40 FuncLoc(s), 12 of them criticality A/B.
  • 6.ML early warning: 69% probability of demand in the next 90 days.
Proposed purchase requisition
104 M
Rp 47.1M · order by 01 Oct 2026
Expected arrival ≈ 32 days
ML early warningSingle source
On hand / on order
135 / 0
no open PO
Today Min / Max
23 / 72
static parameters in BoM
Rec. Min (reorder point)
152
safety stock 133
Rec. Max
239
order qty 87
Service level
99.9%
stockout risk now 1%
Unit price
Rp 452,501
PO history
ML early warning: 69% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 83 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 8 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 40 functional locations

12 with criticality A/B · 300 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TIT-556A
TEMPERATURE
A2510.47
PX_FIT-1016-44B
DILUTION STEAM FLOW
A1000.04
PX_FIT-181
CHARGE GAS FLOW
A0.3200.04
PX_TIT-446
HE-896C TEMPERATURE
A500.04
PX_FIT-1693A
FLOW
B110.04
PX_FIT-1057
FLOW
B0.3200.04
PX_FIT-433A-16A
FLOW
B500.04
PX_LIT-1247
LEVEL
B1000.03
PX_PIT-1324
PRESSURE
B1000.04
PX_PIT-1531
HE-1967C PRESSURE
B0.3200.04
PX_PIT-1770
RICH AMINE PRESSURE
B100.04
PX_PIT-1842A
METHANOL PRESSURE
B2.500.04

Lead time and procurement

Lead time 32 ± 14 days (PO history, 5 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
11 May 2026PR06
Regular replenishment
108Rp 436,11527 May 202616 d
09 Feb 2026PR06
Regular replenishment
137Rp 438,32530 Mar 202649 d
23 Dec 2025PR03
Regular replenishment
146Rp 452,50113 Jan 202621 d
23 Jun 2025PR03
Regular replenishment
137Rp 471,06819 Jul 202526 d
24 May 2025PR03
Regular replenishment
117Rp 462,71026 Jun 202533 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_PIT-758Install scaffolding at PIT-758
05 Sept 2026MediumPX_FIT-1672-48AFIT-1672-48A reading frozen
29 Jul 2026HighPX_PIT-758PIT-758 error
27 Jul 2026MediumPX_FIT-1672-48ARepair insulation FIT-1672-48A
16 Jul 2026MediumPX_PIT-794AInstall cover plate for MCP cracking
20 May 2026MediumPX_PIT-578AAR25/tranmsitter low performance
24 Feb 2026MediumPX_PIT-578AInstall scaffolding at PIT-578A
05 Nov 2025LowPX_PIT-688-21APIT-688-21A error
25 Sept 2025MediumPX_PIT-758Check PIT-758.ok
15 Aug 2025MediumPX_TIT-556A[MSI-B-25-FTU-227] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
10 Jul 202620201000004677Corrective
15 Jun 2026100201000014984Corrective
13 Jan 202610201000002462Corrective
16 Dec 202510201000018349Corrective
11 Dec 20255201000005387Corrective
11 Dec 202550201000005387Corrective
11 Dec 20255201000011198Corrective
06 Aug 20255201000016556Corrective
24 Jul 2025100201000014078Corrective
22 Jul 2025100201000023257Corrective