TUBING,MODEL LV241,NBR

Material 4100041761 · TUBING · Plant 1000

AReorderNormalSlow-moving
Material
4100041761
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
A (5 of 19 FuncLocs A/B)
Supplier
No PO history
Lead time
37 d · P80 49 d
Unit price
Rp 343,328 (est.)

Recommendation

  • 1.Forecast 24 M/year: 24 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~37 days; expected demand during lead time 2.4.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 30, order up to 60.
  • 4.On hand 21 + on order 0 is at or below the reorder point: order 39 now.
  • 5.Installed on 19 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 36% probability of demand in the next 90 days.
Proposed purchase requisition
39 M
Rp 13.4M · order by 01 Oct 2026
Expected arrival ≈ 37 days
ML early warningPrice estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
15 / 29
static parameters in BoM
Rec. Min (reorder point)
30
safety stock 28
Rec. Max
60
order qty 30
Service level
99.7%
stockout risk now 8%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 36% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 335 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 363.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 19 functional locations

5 with criticality A/B · 196 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1125A
FLUSHING OIL FLOW
A2500.04
PX_FIT-181
CHARGE GAS FLOW
A2500.04
PX_PIT-1842A
METHANOL PRESSURE
B2500.04
PX_PIT-247A-21
BFW PRESSURE
B0.500.04
PX_PIT-973B-2
PRESSURE
B1000.04
PX_FIT-1591
HYDROGEN FLOW
C2.530.90
PX_FIT-947-2B
PP-1726 INLET FLOW
C110.04
PX_PIT-797B
PRESSURE
C0.3210.04
PX_FIT-1775
PP-416A INLET FLOW
C1000.04
PX_LIT-670A
HE-1562C LEVEL
C1000.03
PX_LIT-895
LEVEL
C2500.03
PX_PIT-259
VD-209 PRESSURE
C2500.04

Lead time and procurement

Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Mar 2026EmergencyPX_FIT-686A[MSI-B-26-YLM-221] Permanent repair
21 Oct 2025MediumPX_FIT-1591FIT-1591 abnormal indication
08 Oct 2025LowPX_FIT-1591Leak from packing
25 May 2025LowPX_FIT-1591PSM25/Replace lamp as per PM finding
24 May 2025MediumPX_FIT-686AFIT-686A error
22 May 2025MediumPX_PIT-797BAR25/tranmsitter low performance
18 May 2025MediumPX_FIT-947-2BReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
31 Oct 202550201000009269Corrective
21 Jul 202510201000023257Corrective