TUBING,MODEL XM468,SS316

Material 4100041791 · TUBING · Plant 1000

AReorderCriticalStockout
Material
4100041791
Category
TUBING
Base unit
M
MRP type
Non Stock
Criticality
A (3 of 10 FuncLocs A/B)
Supplier
No PO history
Lead time
37 d · P80 49 d
Unit price
Rp 343,328 (est.)

Recommendation

  • 1.Forecast 30 M/year: 30 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~37 days; expected demand during lead time 3.0.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 100.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 100 now.
  • 5.Installed on 10 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
100 M
Rp 34.3M · order by 01 Oct 2026
Expected arrival ≈ 37 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 47
Rec. Max
100
order qty 50
Service level
99.8%
stockout risk now 6%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 296 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 267.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 10 functional locations

3 with criticality A/B · 30 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1278A-8A
BOTTOM FLOW
A0.500.04
PX_PIT-1770
RICH AMINE PRESSURE
B0.500.04
PX_PIT-415
PRESSURE
B0.3200.04
PX_FIT-1996A-4A
HE-749B INLET FLOW
C0.3200.04
PX_LIT-1448
HE-513D LEVEL
C0.3200.03
PX_PIT-1582A
PRESSURE
C0.500.04
PX_PIT-1306-27A
HE-1817C PRESSURE
S2.500.04
PX_PIT-1353C
CONDENSATE PRESSURE
S1000.04
PX_PIT-341A
PRESSURE
S500.04
PY_FIT-995
PP-413 INLET FLOW
S1000.04

Lead time and procurement

Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
09 Dec 202550201000017816Corrective
02 Dec 202550201000000886Corrective