TUBING,SIZE AJ994,VITON
Material 4100041819 · TUBING · Plant 1000
AReorderCriticalStockout
- Material
- 4100041819
- Category
- TUBING
- Base unit
- M
- MRP type
- Non Stock
- Criticality
- A (4 of 10 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 43 d · P80 49 d
- Unit price
- Rp 329,501
Recommendation
- 1.Forecast 11 M/year: 11 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~43 days; expected demand during lead time 1.3.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 20, order up to 40.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 40 now.
- 5.Installed on 10 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 44% probability of demand in the next 90 days.
Proposed purchase requisition
40 M
Rp 13.2M · order by 01 Oct 2026
Expected arrival ≈ 43 days
ML early warningSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
20
safety stock 19
Rec. Max
40
order qty 20
Service level
99.8%
stockout risk now 7%
Unit price
Rp 329,501
PO history
ML early warning: 44% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 246 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 252.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 10 functional locations
4 with criticality A/B · 26.8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LIT-771 KC-671D LEVEL | A | 2.5 | 0 | 0.03 |
| PX_TIT-356A TEMPERATURE | B | 0.32 | 3 | 0.04 |
| PX_FIT-1463-25A GASOLINE FLOW | B | 0.5 | 2 | 0.47 |
| PX_PIT-1926-25 HE-1900C PRESSURE | B | 5 | 0 | 0.04 |
| PX_FIT-1676-50B DEMIN WATER FLOW | C | 1 | 0 | 0.04 |
| PX_FIT-235D-57A HE-955C INLET FLOW | C | 5 | 0 | 0.04 |
| PX_LIT-619A LEVEL | C | 1 | 0 | 0.03 |
| PX_PIT-838 PRESSURE | S | 0.5 | 1 | 0.47 |
| PX_LIT-1762-25B PP-1716 LEVEL | S | 10 | 0 | 0.03 |
| PX_TIT-1328 KC-551D TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 43 ± 16 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 May 2026 | PR06 Regular replenishment | 7 | Rp 333,756 | 13 Jun 2026 | 37 d |
| 14 Dec 2025 | PR04 Regular (other) | 4 | Rp 325,245 | 22 Feb 2026 | 70 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Aug 2026 | Low | PX_TIT-356A | Install scaffolding at TIT-356A |
| 24 Jun 2026 | Low | PX_FIT-1463-25A | Replace lamp as per PM finding |
| 21 Apr 2026 | Low | PX_TIT-356A | Install scaffolding at TIT-356A |
| 19 Jun 2025 | Low | PX_PIT-838 | AR25/tranmsitter low performance |
| 05 Jun 2025 | Low | PX_FIT-1463-25A | Install scaffolding at FIT-1463-25A |
| 27 May 2025 | Medium | PX_TIT-356A | PSM25/Check TIT-356A.ok |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Jan 2026 | 20 | 201000013350 | Corrective |