TUBING,SIZE AJ994,VITON

Material 4100041819 · TUBING · Plant 1000

AReorderCriticalStockout
Material
4100041819
Category
TUBING
Base unit
M
MRP type
Non Stock
Criticality
A (4 of 10 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
43 d · P80 49 d
Unit price
Rp 329,501

Recommendation

  • 1.Forecast 11 M/year: 11 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~43 days; expected demand during lead time 1.3.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 20, order up to 40.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 40 now.
  • 5.Installed on 10 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 44% probability of demand in the next 90 days.
Proposed purchase requisition
40 M
Rp 13.2M · order by 01 Oct 2026
Expected arrival ≈ 43 days
ML early warningSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
20
safety stock 19
Rec. Max
40
order qty 20
Service level
99.8%
stockout risk now 7%
Unit price
Rp 329,501
PO history
ML early warning: 44% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 246 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 252.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 10 functional locations

4 with criticality A/B · 26.8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-771
KC-671D LEVEL
A2.500.03
PX_TIT-356A
TEMPERATURE
B0.3230.04
PX_FIT-1463-25A
GASOLINE FLOW
B0.520.47
PX_PIT-1926-25
HE-1900C PRESSURE
B500.04
PX_FIT-1676-50B
DEMIN WATER FLOW
C100.04
PX_FIT-235D-57A
HE-955C INLET FLOW
C500.04
PX_LIT-619A
LEVEL
C100.03
PX_PIT-838
PRESSURE
S0.510.47
PX_LIT-1762-25B
PP-1716 LEVEL
S1000.03
PX_TIT-1328
KC-551D TEMPERATURE
S100.04

Lead time and procurement

Lead time 43 ± 16 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
07 May 2026PR06
Regular replenishment
7Rp 333,75613 Jun 202637 d
14 Dec 2025PR04
Regular (other)
4Rp 325,24522 Feb 202670 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Aug 2026LowPX_TIT-356AInstall scaffolding at TIT-356A
24 Jun 2026LowPX_FIT-1463-25AReplace lamp as per PM finding
21 Apr 2026LowPX_TIT-356AInstall scaffolding at TIT-356A
19 Jun 2025LowPX_PIT-838AR25/tranmsitter low performance
05 Jun 2025LowPX_FIT-1463-25AInstall scaffolding at FIT-1463-25A
27 May 2025MediumPX_TIT-356APSM25/Check TIT-356A.ok

Recent goods issues

Posting dateQtyOrderOrder type
28 Jan 202620201000013350Corrective