TUBING,MODEL NA608,SS316
Material 4100041847 · TUBING · Plant 1000
- Material
- 4100041847
- Category
- TUBING
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- A (3 of 7 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 37 d · P80 49 d
- Unit price
- Rp 343,328 (est.)
Recommendation
- 1.Forecast 9.4 M/year: 9.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~37 days; expected demand during lead time 0.9.
- 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 50.
- 4.Stock 81 exceeds the level to keep (50) by 31.
- 5.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 83.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 7 functional locations
3 with criticality A/B · 66.1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-1100C PRESSURE | A | 25 | 0 | 0.04 |
| PX_LIT-441 PP-1477B LEVEL | B | 0.5 | 0 | 0.03 |
| PX_PIT-1337 PRESSURE | B | 25 | 0 | 0.04 |
| PX_FIT-1779-4 LEAN AMINE FLOW | C | 5 | 0 | 0.04 |
| PX_FIT-742-39 FLOW | C | 10 | 0 | 0.04 |
| PX_LIT-1726 PP-387 LEVEL | C | 0.32 | 0 | 0.03 |
| PX_TIT-1795A TEMPERATURE | C | 0.32 | 0 | 0.04 |
Lead time and procurement
Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Aug 2025 | 50 | 201000004846 | Corrective |