Sparely
DU

TUBING,TYPE LE367,SS316

Material 4100041851 · TUBING · Plant 1000

AReorderNormalBelow reorder point
Material
4100041851
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
A (7 of 11 FuncLocs A/B)
Supplier
No PO history
Lead time
37 d · P80 49 d
Unit price
Rp 343,328 (est.)

Recommendation

  • 1.Forecast 44 M/year: 44 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~37 days; expected demand during lead time 4.4.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 55, order up to 110.
  • 4.On hand 25 + on order 0 is at or below the reorder point: order 85 now.
  • 5.Installed on 11 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
85 M
Rp 29.2M · order by 01 Oct 2026
Expected arrival ≈ 37 days
Price estimatedLead time estimated
On hand / on order
25 / 0
no open PO
Today Min / Max
21 / 31
static parameters in BoM
Rec. Min (reorder point)
55
safety stock 51
Rec. Max
110
order qty 55
Service level
99.7%
stockout risk now 8%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 90 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 357.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 11 functional locations

7 with criticality A/B · 66.6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-153-2A
LEVEL
A0.3200.03
PX_LIT-1788A-20
VD-899 LEVEL
A1000.03
PX_PIT-1311B
PRESSURE
A500.04
PX_TIT-359
TEMPERATURE
A500.04
PX_FIT-1057
FLOW
B1000.04
PX_FIT-733A-59A
BOTTOM FLOW
B1000.04
PX_PIT-119
PRESSURE
B100.04
PX_FIT-947-2B
PP-1726 INLET FLOW
C1010.04
PX_FIT-1227
FUEL OIL FLOW
C500.04
PX_PIT-1798
KC-224A PRESSURE
C1000.04
PX_PIT-841
HE-846B PRESSURE
C0.3200.04

Lead time and procurement

Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 May 2025MediumPX_FIT-947-2BReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
03 Jul 202610201000014181Corrective
15 Jun 2025100201000039375Corrective