TUBING,TYPE UZ48,GRAPHITE
Material 4100041864 · TUBING · Plant 1000
AMonitorHealthy
- Material
- 4100041864
- Category
- TUBING
- Base unit
- M
- MRP type
- Non Stock
- Criticality
- A (2 of 9 FuncLocs A/B)
- Supplier
- GUNUNG UTAMA LESTARI PT
- Lead time
- 59 d · P80 49 d
- Unit price
- Rp 772,247
Recommendation
- 1.Forecast 13 M/year: 13 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~59 days; expected demand during lead time 2.0.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 20, order up to 40.
- 4.Installed on 9 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 57% probability of demand in the next 90 days.
ML early warningSingle sourceOpen PO
On hand / on order
13 / 15
next delivery 04 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
20
safety stock 18
Rec. Max
40
order qty 20
Service level
99.5%
stockout risk now 0%
Unit price
Rp 772,247
PO history
ML early warning: 57% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 76 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 278.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 9 functional locations
2 with criticality A/B · 25.6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-450-23 VD-1906 PRESSURE | A | 0.32 | 0 | 0.04 |
| PX_PIT-1479-50 PRESSURE | B | 0.32 | 0 | 0.04 |
| PY_FIT-1107 FLOW | C | 1 | 1 | 0.47 |
| PX_LIT-1783-32B PP-1007A LEVEL | C | 2.5 | 0 | 0.03 |
| PX_LIT-1984 VD-884A LEVEL | C | 1 | 0 | 0.03 |
| PX_LIT-677A LEVEL | C | 5 | 0 | 0.03 |
| PX_LIT-888-19B LEVEL | C | 10 | 0 | 0.03 |
| PX_TIT-244 VD-1495C TEMPERATURE | C | 0.5 | 0 | 0.04 |
| PX_PIT-279A HE-184B PRESSURE | S | 5 | 0 | 0.04 |
Lead time and procurement
Lead time 59 ± 16 days (PO history + category, 2 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Sept 2026 | PR06 Regular replenishment | 6 | Rp 792,965 | 20 Jan 2027 open | 125 d |
| 07 Aug 2026 | PR01 Import / long-lead | 9 | Rp 751,528 | 04 Oct 2026 open | 58 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Jul 2025 | Medium | PY_FIT-1107 | PSM25/FIT-1107 error |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Jul 2026 | 20 | 201000010505 | Corrective |