TUBING,TYPE UD810,GRAPHITE

Material 4100041935 · TUBING · Plant 1000

BMonitorTAM reserve
Material
4100041935
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
37 d · P80 45 d
Unit price
Rp 581,541

Recommendation

  • 1.Forecast 0.2 M/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~37 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Used only during the last turnaround (105 M): keep it for the next one instead of treating it as slow-moving.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Last turnaround used 105Convert to Non StockSingle source
On hand / on order
73 / 0
no open PO
Today Min / Max
39 / 111
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 581,541
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (105 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 352,416/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1676A
METHANOL FLOW
B100.04
PX_LIT-1440-40
KC-660A LEVEL
C100.03

Lead time and procurement

Lead time 37 ± 15 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
16 Apr 2026PR03
Regular replenishment
22Rp 555,27908 May 202622 d
26 Oct 2025PR03
Regular replenishment
15Rp 581,54110 Dec 202545 d
27 Sept 2025PR03
Regular replenishment
22Rp 589,39411 Nov 202545 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
06 Nov 202520203000039255Turnaround
05 Nov 202550203000039255Turnaround
03 Nov 20255203000039255Turnaround
03 Nov 202510203000039255Turnaround
01 Nov 202520203000039255Turnaround