Sparely
DU

TUBING,MODEL KO708,SS316

Material 4100041945 · TUBING · Plant 1000

CMonitorSlow-moving
Material
4100041945
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
C (0 of 6 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
34 d · P80 49 d
Unit price
Rp 199,741

Recommendation

  • 1.Forecast 27 M/year: 27 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~34 days; expected demand during lead time 2.5.
  • 3.A 97.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 100.
Single source
On hand / on order
18 / 0
no open PO
Today Min / Max
11 / 24
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
100
order qty 100
Service level
97.5%
stockout risk now 3%
Unit price
Rp 199,741
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 262 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~21 days.

Installed on 6 functional locations

0 with criticality A/B · 18.5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-1188
HE-192B LEVEL
C510.03
PX_PIT-427B-28
QUENCH WATER PRESSURE
C510.04
PX_FIT-362A-57
FLOW
C2.500.04
PX_LIT-188-22B
VD-1823 LEVEL
C2.500.03
PX_PIT-767B
HE-995C PRESSURE
C100.04
PX_DPT-1723A
PP-604C DP
S2.510.06

Lead time and procurement

Lead time 34 ± 16 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
28 Jul 2026PR06
Regular replenishment
25Rp 199,94722 Aug 202625 d
26 Jul 2025PR06
Regular replenishment
33Rp 199,53401 Sept 202537 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Jun 2025LowPX_DPT-1723AInstall scaffolding at DPT-1723A
07 May 2025MediumPX_PIT-427B-28AR25/tranmsitter low performance
04 May 2025MediumPX_LIT-1188Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
12 Jan 2026100201000009630Corrective