TUBING,TYPE DY348,SS304
Material 4100041961 · TUBING · Plant 1000
BReduceNon-moving
- Material
- 4100041961
- Category
- TUBING
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- B (1 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 37 d · P80 49 d
- Unit price
- Rp 343,328 (est.)
Recommendation
- 1.Forecast 0.6 M/year: 0.6 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~37 days; expected demand during lead time 0.1.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 7 exceeds the level to keep (0) by 7.
- 5.Installed on 6 FuncLoc(s), 1 of them criticality A/B.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.
Installed on 6 functional locations
1 with criticality A/B · 88 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-1738 DILUTION STEAM FLOW | B | 25 | 0 | 0.04 |
| PX_FIT-1526D BFW FLOW | C | 25 | 0 | 0.04 |
| PX_PIT-1358-19 CL-816 PRESSURE | C | 25 | 0 | 0.04 |
| PX_TIT-1088 TEMPERATURE | C | 10 | 0 | 0.04 |
| PX_TIT-1408 PP-604C TEMPERATURE | C | 0.5 | 0 | 0.04 |
| PX_DPT-1881-33B DIFF. PRESSURE | S | 2.5 | 1 | 0.06 |
Lead time and procurement
Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 May 2025 | High | PX_DPT-1881-33B | Check DPT-1881-33B.ok |
Recent goods issues
Never issued in the 17-month history.