TUBING,MODEL AB245,GRAPHITE

Material 4100042070 · TUBING · Plant 1000

AReorderNormalBelow reorder point
Material
4100042070
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
37 d · P80 49 d
Unit price
Rp 343,328 (est.)

Recommendation

  • 1.Forecast 23 M/year: 23 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~37 days; expected demand during lead time 2.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 55, order up to 110.
  • 4.On hand 12 + on order 0 is at or below the reorder point: order 98 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
98 M
Rp 33.6M · order by 01 Oct 2026
Expected arrival ≈ 37 days
Price estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
5 / 15
static parameters in BoM
Rec. Min (reorder point)
55
safety stock 53
Rec. Max
110
order qty 55
Service level
99.9%
stockout risk now 4%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 78 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 188.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 2 functional locations

1 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-1813
PP-992B LEVEL
A100.03
PX_FIT-1177A
HE-534C INLET FLOW
C1000.04

Lead time and procurement

Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
15 Jul 202650201000007763Corrective
15 Jul 20265201000007763Corrective