Sparely
DU

TUBING,SIZE LS165,PTFE

Material 4100042229 · TUBING · Plant 1000

BMonitorCritical insurance spare
Material
4100042229
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
37 d · P80 49 d
Unit price
Rp 343,328 (est.)

Recommendation

  • 1.Forecast 1.9 M/year: 1.9 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~37 days; expected demand during lead time 0.2.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 50.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
50
order qty 50
Service level
99.6%
stockout risk now 0%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 2 functional locations

1 with criticality A/B · 5.5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PIT-123C
COOLING WATER PRESSURE
B0.500.04
PX_TIT-828A-53
HE-1375C TEMPERATURE
S520.90

Lead time and procurement

Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Dec 2025MediumPX_TIT-828A-53AR25/tranmsitter low performance
07 Jun 2025LowPX_TIT-828A-53TIT-828A-53 error

Recent goods issues

Never issued in the 17-month history.