Sparely
DU

TUBING,TYPE KV230,A182F11

Material 4100042267 · TUBING · Plant 1000

BReorderNormalSlow-moving
Material
4100042267
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
37 d · P80 49 d
Unit price
Rp 343,328 (est.)

Recommendation

  • 1.Forecast 4.6 M/year: 4.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~37 days; expected demand during lead time 0.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 20.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 16 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
16 M
Rp 5.5M · order by 01 Oct 2026
Expected arrival ≈ 37 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
20
order qty 10
Service level
99.9%
stockout risk now 5%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 277 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 51.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 2 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-1335A
PP-1914D DP
B2.500.06
PX_PIT-965
PRESSURE
S0.520.90

Lead time and procurement

Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 May 2026MediumPX_PIT-965PIT-965 abnormal indication
28 Aug 2025LowPX_PIT-965Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
28 Dec 202510201000035558Corrective