TUBING,TYPE KV230,A182F11
Material 4100042267 · TUBING · Plant 1000
BReorderNormalSlow-moving
- Material
- 4100042267
- Category
- TUBING
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 37 d · P80 49 d
- Unit price
- Rp 343,328 (est.)
Recommendation
- 1.Forecast 4.6 M/year: 4.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~37 days; expected demand during lead time 0.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 20.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 16 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
16 M
Rp 5.5M · order by 01 Oct 2026
Expected arrival ≈ 37 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
20
order qty 10
Service level
99.9%
stockout risk now 5%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 277 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 51.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.
Installed on 2 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_DPT-1335A PP-1914D DP | B | 2.5 | 0 | 0.06 |
| PX_PIT-965 PRESSURE | S | 0.5 | 2 | 0.90 |
Lead time and procurement
Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 May 2026 | Medium | PX_PIT-965 | PIT-965 abnormal indication |
| 28 Aug 2025 | Low | PX_PIT-965 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Dec 2025 | 10 | 201000035558 | Corrective |