TUBING,SIZE GN560,CS
Material 4100042903 · TUBING · Plant 1000
- Material
- 4100042903
- Category
- TUBING
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 37 d · P80 49 d
- Unit price
- Rp 343,328 (est.)
Recommendation
- 1.Forecast 0.1 M/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~37 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 116 exceeds the level to keep (0) by 116.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 186,925/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.
Installed on 1 functional locations
1 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-1770 RICH AMINE PRESSURE | B | 10 | 0 | 0.04 |
Lead time and procurement
Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.