TUBING,TYPE PZ68,SS316

Material 4100043008 · TUBING · Plant 1000

CMonitorHealthy
Material
4100043008
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
37 d · P80 49 d
Unit price
Rp 343,328 (est.)

Recommendation

  • 1.Forecast 56 M/year: 56 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~37 days; expected demand during lead time 5.6.
  • 3.A 90.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 55.
Price estimatedLead time estimated
On hand / on order
9 / 0
no open PO
Today Min / Max
9 / 28
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
55
order qty 55
Service level
90.3%
stockout risk now 10%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 123 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~21 days.

Installed on 1 functional locations

0 with criticality A/B · 0.5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-1977A
HE-729B LEVEL
C0.500.03

Lead time and procurement

Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
31 May 202610201000020779Corrective
30 May 2026100201000020779Corrective