TUBING,TYPE JV11,SS304
Material 4100043044 · TUBING · Plant 1000
BReorderNormalBelow reorder point
- Material
- 4100043044
- Category
- TUBING
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 36 d · P80 45 d
- Unit price
- Rp 90,169
Recommendation
- 1.Forecast 84 M/year: 84 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~36 days; expected demand during lead time 8.3.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 78, order up to 163.
- 4.On hand 35 + on order 0 is at or below the reorder point: order 128 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
128 M
Rp 11.5M · order by 01 Oct 2026
Expected arrival ≈ 36 days
Single source
On hand / on order
35 / 0
no open PO
Today Min / Max
19 / 44
static parameters in BoM
Rec. Min (reorder point)
78
safety stock 70
Rec. Max
163
order qty 85
Service level
99.5%
stockout risk now 10%
Unit price
Rp 90,169
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 157 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 122.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.
Installed on 2 functional locations
1 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LIT-1337-38 PP-1309C LEVEL | B | 10 | 0 | 0.03 |
| PX_PIT-758B-19 KC-426D PRESSURE | S | 1 | 3 | 0.90 |
Lead time and procurement
Lead time 36 ± 16 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Feb 2026 | PR03 Regular replenishment | 34 | Rp 90,169 | 17 Mar 2026 | 19 d |
| 27 Oct 2025 | PR06 Regular replenishment | 53 | Rp 86,063 | 17 Dec 2025 | 51 d |
| 25 Jun 2025 | PR06 Regular replenishment | 34 | Rp 90,200 | 31 Jul 2025 | 36 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Mar 2026 | Medium | PX_PIT-758B-19 | PIT-758B-19 error |
| 18 Dec 2025 | Medium | PX_PIT-758B-19 | Leak from packing |
| 10 May 2025 | Medium | PX_PIT-758B-19 | PIT-758B-19 reading frozen |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Apr 2026 | 5 | 201000009480 | Corrective |
| 27 Apr 2026 | 100 | 201000009480 | Corrective |
| 26 Apr 2026 | 50 | 201000009480 | Corrective |