TUBING,MODEL QW906,NBR
Material 4100043111 · TUBING · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100043111
- Category
- TUBING
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 39 d · P80 49 d
- Unit price
- Rp 357,155
Recommendation
- 1.Forecast 1.8 M/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~39 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 8 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 M
Rp 2.9M · order by 01 Oct 2026
Expected arrival ≈ 39 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.9%
stockout risk now 4%
Unit price
Rp 357,155
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 115 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 163.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 2 functional locations
1 with criticality A/B · 2.82 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LIT-893 CL-1681 LEVEL | A | 2.5 | 0 | 0.03 |
| PX_LIT-1403 LEVEL | C | 0.32 | 0 | 0.03 |
Lead time and procurement
Lead time 39 ± 16 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 23 Sept 2025 | PR03 Regular replenishment | 1 | Rp 357,155 | 08 Nov 2025 | 46 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jun 2026 | 5 | 201000033234 | Corrective |