Sparely
DU

TUBING,MODEL IZ673,CS

Material 4100043271 · TUBING · Plant 1000

BReduceNon-moving
Material
4100043271
Category
TUBING
Base unit
M
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
37 d · P80 49 d
Unit price
Rp 343,328 (est.)

Recommendation

  • 1.Forecast 0.1 M/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~37 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 1 exceeds the level to keep (0) by 1.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 343,328
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 285,306/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 1 functional locations

1 with criticality A/B · 0.5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-551
VD-740 DP
B0.500.06

Lead time and procurement

Lead time 37 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.