TRIM SET,CONTROL VALVE,MODEL RD612,INCOL

Material 4100043347 · TRIM SET · Plant 1000

AReduceExcess
Material
4100043347
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
A (19 of 32 FuncLocs A/B)
Supplier
No PO history
Lead time
159 d · P80 236 d
Unit price
Rp 78.5M (est.)

Recommendation

  • 1.Forecast 2.8 SET/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~159 days; expected demand during lead time 1.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 6.
  • 4.Stock 31 exceeds the level to keep (6) by 25.
  • 5.Installed on 32 FuncLoc(s), 19 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
31 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
6
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 118 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 32 functional locations

19 with criticality A/B · 45 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-143A
HE-1596B PRESSURE CONTROL
A110.08
PX_TCV-1344
TEMPERATURE CONTROL VALVE
A110.12
PY_TCV-1902
HE-1026 TEMP CONTROL
A110.12
PX_FCV-1152
RECYCLE ETHANE FLOW CONTROL
A100.11
PX_FCV-1181
CONTROL VALVE
A100.11
PX_LCV-1400
HE-1767 LEVEL CONTROL
A400.12
PX_LCV-619A
LEVEL CONTROL VALVE
A400.12
PX_PCV-1407
PP-1125B PRESSURE CONTROL
A300.08
PX_PCV-380
HE-1557D PRESSURE CONTROL
A100.08
PX_PCV-809
PP-167 PRESSURE CONTROL
A100.08
PX_PCV-984
KC-984C PRESSURE CONTROL
A200.08
PX_LCV-1372A
PP-1720D LEVEL CONTROL
B141.83

Lead time and procurement

Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Jul 2026MediumPX_LCV-1372A[MSI-B-26-YDT-175/M] Replace line
05 Jul 2026MediumPX_LCV-365LCV-365; valve hunting
07 Jun 2026MediumPX_TCV-240Replace lamp as per PM finding
29 Mar 2026MediumPX_LCV-1372AOverhaul LCV-1372A
18 Jan 2026MediumPX_TCV-240TCV-240; small leak at packing
30 Dec 2025LowPX_LCV-1372AReplace lamp as per PM finding
12 Dec 2025LowPX_PCV-1713PCV-1713; small leak at packing
03 Nov 2025MediumPX_PCV-1713PCV-1713 passing
28 Oct 2025MediumPX_PCV-1713Overhaul PCV-1713
23 Sept 2025MediumPX_TCV-240TCV-240 passing

Recent goods issues

Posting dateQtyOrderOrder type
05 Jun 20261201000009741Corrective
04 Jun 20261201000009741Corrective