TRIM SET,CONTROL VALVE,SIZE NN15,PTFE
Material 4100043368 · TRIM SET · Plant 1000
ALong-leadMaintainHealthy
- Material
- 4100043368
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (9 of 15 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 192 d · P80 263 d
- Unit price
- Rp 289.9M
Recommendation
- 1.Forecast 2.2 SET/year: 2.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~192 days; expected demand during lead time 1.2.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
- 4.Long lead time: 80% of deliveries took up to 263 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 15 FuncLoc(s), 9 of them criticality A/B.
- 6.ML early warning: 35% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceOpen PO
On hand / on order
2 / 3
next delivery 28 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
5
order qty 1
Service level
99.3%
stockout risk now 0%
Unit price
Rp 289.9M
PO history
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 179 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 15 functional locations
9 with criticality A/B · 18 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1156C PP-1323A OUTLET FLOW | A | 1 | 0 | 0.11 |
| PX_FCV-1679A CONTROL VALVE | A | 1 | 0 | 0.11 |
| PX_TCV-946 TEMPERATURE CONTROL VALVE | A | 1 | 0 | 0.12 |
| PX_FCV-1003A BY PASS LINE | B | 1 | 0 | 0.11 |
| PX_FCV-1761 FLUSHING OIL FLOW CONTROL | B | 1 | 0 | 0.11 |
| PX_LCV-1697 LEVEL CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_PCV-499 BY PASS DUCT | B | 1 | 0 | 0.08 |
| PX_PCV-913 BY PASS DUCT | B | 1 | 0 | 0.08 |
| PY_FCV-1766 WASH WATER FLOW CONTROL | B | 1 | 0 | 0.11 |
| PX_PCV-372 PRESSURE CONTROL VALVE | C | 1 | 3 | 0.94 |
| PX_FCV-327 CONTROL VALVE | C | 1 | 1 | 0.54 |
| PX_FCV-1089 CONTROL VALVE | C | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 192 ± 71 days (PO history, 5 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Aug 2026 | PR03 Regular replenishment | 1 | Rp 283.6M | 08 Dec 2026 open | 119 d |
| 06 Aug 2026 | PR03 Regular replenishment | 1 | Rp 293.6M | 21 Feb 2027 open | 199 d |
| 16 Feb 2026 | PR03 Regular replenishment | 1 | Rp 295.6M | 28 Nov 2026 open | 285 d |
| 08 Oct 2025 | PR03 Regular replenishment | 2 | Rp 278.0M | 23 Jun 2026 | 258 d |
| 08 Aug 2025 | PR06 Regular replenishment | 1 | Rp 289.9M | 20 Feb 2026 | 196 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 May 2026 | Low | PX_PCV-372 | PCV-372 passing |
| 08 Feb 2026 | Low | PX_PCV-372 | PCV-372; valve hunting |
| 20 Jun 2025 | Low | PX_FCV-327 | FCV-327 stuck |
| 15 May 2025 | Medium | PX_PCV-372 | PSM25/Overhaul PCV-372 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Apr 2026 | 1 | 205000023443 | Other maintenance |
| 23 Feb 2026 | 1 | 201000001108 | Corrective |
| 13 Feb 2026 | 1 | 201000018387 | Corrective |
| 27 Nov 2025 | 1 | 201000004723 | Corrective |