TRIM SET,CONTROL VALVE,MODEL GP627,SS316

Material 4100043407 · TRIM SET · Plant 1000

AReorderCriticalStockout
Material
4100043407
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
A (9 of 16 FuncLocs A/B)
Supplier
No PO history
Lead time
159 d · P80 236 d
Unit price
Rp 78.5M (est.)

Recommendation

  • 1.Forecast 3.2 SET/year: 3.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~159 days; expected demand during lead time 1.4.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 16 FuncLoc(s), 9 of them criticality A/B.
Proposed purchase requisition
8 SET
Rp 627.9M · order by 01 Oct 2026
Expected arrival ≈ 159 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.7%
stockout risk now 61%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 62 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 16 functional locations

9 with criticality A/B · 22 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-610B
PP-251C OUTLET FLOW
A120.11
PX_TCV-868
TEMPERATURE CONTROL VALVE
A120.55
PX_TCV-880
TEMPERATURE CONTROL VALVE
A110.12
PX_FCV-933A
RECYCLE ETHANE FLOW CONTROL
A100.11
PX_LCV-1703
PP-1325 LEVEL CONTROL
A100.12
PX_PCV-194
HE-1680D PRESSURE CONTROL
A400.08
PX_LCV-482
CL-899 LEVEL CONTROL
B110.12
PX_PCV-1940
VD-928B PRESSURE CONTROL
B100.08
PX_TCV-529
TEMPERATURE CONTROL VALVE
B100.12
PX_FCV-1570B
BY PASS LINE
C110.11
PX_FCV-550
RICH AMINE FLOW CONTROL
C100.11
PX_PCV-367
VD-450 PRESSURE CONTROL
C100.08

Lead time and procurement

Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Dec 2025MediumPX_TCV-868[MSI-B-25-TDD-370] Permanent repair
10 Sept 2025LowPX_FCV-610BInstall scaffolding at FCV-610B
17 Jul 2025MediumPX_FCV-1570BPSM25/Install scaffolding at FCV-1570B
27 May 2025MediumPX_TCV-880Install scaffolding at TCV-880
26 May 2025HighPX_LCV-482Leak from packing
23 May 2025LowPX_FCV-610BReplace lamp as per PM finding
17 May 2025LowPX_FCV-1289Leak from packing
11 May 2025HighPX_TCV-868PSM25/TCV-868; IA leak from regulator

Recent goods issues

Posting dateQtyOrderOrder type
31 Jul 20262201000001731Corrective
16 Dec 20251201000020854Corrective
14 Dec 20252201000025743Corrective
23 Oct 20251201000029226Corrective