TRIM SET,CONTROL VALVE,TYPE BD460,CS

Material 4100043428 · TRIM SET · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100043428
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
A (6 of 10 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
123 d · P80 109 d
Unit price
Rp 50.0M

Recommendation

  • 1.Forecast 2.4 SET/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~123 days; expected demand during lead time 0.8.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
  • 4.On hand 0 + on order 2 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 109 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 10 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 150.1M · order by 01 Oct 2026
Expected arrival ≈ 123 days
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 06 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
5
order qty 1
Service level
99.8%
stockout risk now 5%
Unit price
Rp 50.0M
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 116 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 10 functional locations

6 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1620
LEVEL CONTROL VALVE
A152.26
PX_PCV-1454
PRESSURE CONTROL VALVE
A100.08
PX_PCV-1925B
BY PASS DUCT
B110.08
PX_FCV-1639
BY PASS LINE
B100.11
PX_FCV-568
BY PASS LINE
B100.11
PX_TCV-1241A
CL-1475 TEMP CONTROL
B100.12
PX_FCV-465
PP-1029C OUTLET FLOW
C120.54
PX_LCV-574
LEVEL CONTROL VALVE
C100.12
PX_PCV-841A
KC-155 PRESSURE CONTROL
C300.08
PX_LCV-1502
LEVEL CONTROL VALVE
S100.12

Lead time and procurement

Lead time 123 ± 66 days (PO history, 3 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
08 Sept 2026PR06
Regular replenishment
2Rp 50.0M06 Nov 2026
open
59 d
30 Jul 2026PR06
Regular replenishment
2Rp 50.5M25 Sept 202657 d
30 Sept 2025PR01
Import / long-lead
1Rp 49.4M19 Feb 2026142 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Aug 2026MediumPX_LCV-1620Repair insulation LCV-1620
09 Apr 2026MediumPX_LCV-1620LCV-1620 passing
19 Dec 2025LowPX_LCV-1620LCV-1620; small leak at packing
01 Nov 2025MediumPX_LCV-1620LCV-1620 stuck
08 Oct 2025MediumPX_FCV-465Painting FCV-465
27 Jul 2025MediumPX_FCV-465Overhaul FCV-465
26 Jun 2025MediumPX_LCV-1620Leak from packing
09 May 2025MediumPX_PCV-1925BPCV-1925B passing

Recent goods issues

Posting dateQtyOrderOrder type
07 Jun 20261201000011195Corrective
25 May 20261201000006992Corrective
24 May 20261201000006992Corrective