TRIM SET,CONTROL VALVE,MODEL YO607,SS316
Material 4100043447 · TRIM SET · Plant 1000
AReorderCriticalStockout
- Material
- 4100043447
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (3 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 159 d · P80 236 d
- Unit price
- Rp 78.5M (est.)
Recommendation
- 1.Forecast 3.1 SET/year: 3.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~159 days; expected demand during lead time 1.3.
- 3.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 9 now.
- 5.Installed on 8 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
9 SET
Rp 706.4M · order by 01 Oct 2026
Expected arrival ≈ 159 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
9
order qty 3
Service level
98.9%
stockout risk now 36%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 8 functional locations
3 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-293 TEMPERATURE CONTROL VALVE | A | 1 | 0 | 0.12 |
| PX_FCV-1487 BY PASS LINE | B | 1 | 0 | 0.11 |
| PX_TCV-1241A CL-1475 TEMP CONTROL | B | 1 | 0 | 0.12 |
| PX_PCV-165C PRESSURE CONTROL VALVE | C | 1 | 3 | 0.94 |
| PX_FCV-1717 BY PASS LINE | C | 1 | 0 | 0.11 |
| PX_FCV-456A BY PASS LINE | C | 1 | 0 | 0.11 |
| PX_LCV-1317A VD-105C LEVEL CONTROL | C | 1 | 0 | 0.12 |
| PX_PCV-1135 PP-1811A PRESSURE CONTROL | C | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_PCV-165C | [MSI-B-26-AJT-261] Permanent repair |
| 12 May 2026 | Medium | PX_PCV-165C | Install scaffolding at PCV-165C |
| 11 Jun 2025 | Low | PX_PCV-165C | PCV-165C stuck |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 3 | 201000010300 | Corrective |