TRIM SET,CONTROL VALVE,MODEL SN32,VITON

Material 4100043458 · TRIM SET · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100043458
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
155 d · P80 236 d
Unit price
Rp 73.0M

Recommendation

  • 1.Forecast 0.7 SET/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~155 days; expected demand during lead time 0.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 73.0M · order by 01 Oct 2026
Expected arrival ≈ 155 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 73.0M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 270 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 6 functional locations

3 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1960
PRESSURE CONTROL VALVE
A240.94
PX_PCV-1397
BY PASS DUCT
A100.08
PX_PCV-343
HE-1326D PRESSURE CONTROL
A100.08
UT_LCV-710
LEVEL CONTROL VALVE
C120.55
PY_LCV-1843A
HE-1008A LEVEL CONTROL
C100.12
PX_FCV-205B
ETHYLENE FLOW CONTROL
S100.11

Lead time and procurement

Lead time 155 ± 83 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
31 Oct 2025PR06
Regular replenishment
2Rp 73.0M21 Mar 2026141 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Jul 2026MediumPX_PCV-1960[MSI-B-26-MWB-146] Permanent repair
07 Jul 2026MediumUT_LCV-710LCV-710; IA leak from regulator
22 Mar 2026MediumPX_PCV-1960Leak from packing
09 Feb 2026HighPX_PCV-1960Install scaffolding at PCV-1960
10 May 2025HighUT_LCV-710LCV-710; IA leak from regulator
05 May 2025LowPX_PCV-1960PCV-1960; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
04 Jan 20261201000001195Corrective