TRIM SET,CONTROL VALVE,SIZE QH233,GRAPHI
Material 4100043468 · TRIM SET · Plant 1000
BLong-leadReduceSlow-moving
- Material
- 4100043468
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- B (3 of 3 FuncLocs A/B)
- Supplier
- MEGA TEKNIK MAKMUR PT
- Lead time
- 147 d · P80 198 d
- Unit price
- Rp 55.2M
Recommendation
- 1.Forecast 0.6 SET/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~147 days; expected demand during lead time 0.2.
- 3.A 89.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 5 exceeds the level to keep (2) by 3.
- 5.Long lead time: 80% of deliveries took up to 198 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Long-leadSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
89.5%
stockout risk now 0%
Unit price
Rp 55.2M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 280 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 109.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-158 PP-1143B LEVEL CONTROL | B | 1 | 0 | 0.12 |
| PX_PCV-1406D BY PASS DUCT | B | 1 | 0 | 0.08 |
| PX_TCV-700 TEMPERATURE CONTROL VALVE | B | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 147 ± 79 days (PO history, 4 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Jul 2026 | PR03 Regular replenishment | 2 | Rp 53.0M | 16 Sept 2026 | 76 d |
| 06 Jan 2026 | PR06 Regular replenishment | 2 | Rp 56.5M | 07 Jul 2026 | 182 d |
| 24 Oct 2025 | PR03 Regular replenishment | 1 | Rp 55.9M | 03 Jun 2026 | 222 d |
| 10 Jul 2025 | PR03 Regular replenishment | 2 | Rp 54.5M | 22 Sept 2025 | 74 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Dec 2025 | 2 | 201000038136 | Corrective |