TRIM SET,CONTROL VALVE,TYPE TZ314,A105

Material 4100043505 · TRIM SET · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100043505
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
A (2 of 7 FuncLocs A/B)
Supplier
SINAR INSTRUMEN NUSANTARA PT
Lead time
170 d · P80 213 d
Unit price
Rp 23.4M

Recommendation

  • 1.Forecast 3.1 SET/year: 3.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~170 days; expected demand during lead time 1.4.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 9.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 8 now.
  • 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
8 SET
Rp 187.3M · order by 01 Oct 2026
Expected arrival ≈ 170 days
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 11 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
9
order qty 2
Service level
99.8%
stockout risk now 58%
Unit price
Rp 23.4M
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 52 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 7 functional locations

2 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1049
PRESSURE CONTROL VALVE
A100.08
PX_TCV-233
TEMPERATURE CONTROL VALVE
A100.12
PX_FCV-1668A
BY PASS LINE
C100.11
PX_LCV-787A
LEVEL CONTROL VALVE
C100.12
PX_PCV-185
BY PASS DUCT
C100.08
PX_PCV-912A
PRESSURE CONTROL VALVE
C100.08
PY_LCV-1843A
HE-1008A LEVEL CONTROL
C100.12

Lead time and procurement

Lead time 170 ± 68 days (PO history, 3 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
22 Mar 2026PR06
Regular replenishment
1Rp 23.4M11 Nov 2026
open
234 d
05 Feb 2026PR05
Project / turnaround
1Rp 22.6M05 Aug 2026181 d
15 May 2025PR06
Regular replenishment
2Rp 24.0M22 Sept 2025130 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
10 Aug 20262204000007036Preventive
08 Jun 20262201000037598Corrective
20 Nov 20251201000019339Corrective