TRIM SET,CONTROL VALVE,TYPE YN647,NBR

Material 4100043541 · TRIM SET · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100043541
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
MEGA TEKNIK MAKMUR PT
Lead time
196 d · P80 236 d
Unit price
Rp 24.7M

Recommendation

  • 1.Forecast 0.4 SET/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~196 days; expected demand during lead time 0.2.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
  • 7.ML early warning: 47% probability of demand in the next 90 days.
Proposed purchase requisition
2 SET
Rp 49.5M · order by 01 Oct 2026
Expected arrival ≈ 196 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 25 Jul 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.8%
stockout risk now 2%
Unit price
Rp 24.7M
PO history
ML early warning: 47% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 406 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 666.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 6 functional locations

5 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1395
HE-275C OUTLET FLOW
A100.11
PX_FCV-665
VD-339 OUTLET FLOW
B120.54
PX_TCV-1379
PP-1144B TEMP CONTROL
B120.12
PX_FCV-1931
BY PASS LINE
B110.11
PX_LCV-965
LEVEL CONTROL VALVE
B100.12
PX_PCV-577
PRESSURE CONTROL VALVE
C200.08

Lead time and procurement

Lead time 196 ± 83 days (PO history + category, 1 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
20 Sept 2026PR06
Regular replenishment
1Rp 24.7M25 Jul 2027
open
308 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 May 2026LowPX_FCV-665FCV-665; valve hunting
28 Jan 2026LowPX_TCV-1379Install scaffolding at TCV-1379
31 May 2025LowPX_FCV-1931FCV-1931; small leak at packing
25 May 2025LowPX_FCV-665Repair insulation FCV-665
18 May 2025LowPX_TCV-1379TCV-1379 passing

Recent goods issues

Posting dateQtyOrderOrder type
21 Aug 20251201000010238Corrective