TRIM SET,CONTROL VALVE,TYPE YN647,NBR
Material 4100043541 · TRIM SET · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100043541
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (5 of 6 FuncLocs A/B)
- Supplier
- MEGA TEKNIK MAKMUR PT
- Lead time
- 196 d · P80 236 d
- Unit price
- Rp 24.7M
Recommendation
- 1.Forecast 0.4 SET/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~196 days; expected demand during lead time 0.2.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 1 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
- 7.ML early warning: 47% probability of demand in the next 90 days.
Proposed purchase requisition
2 SET
Rp 49.5M · order by 01 Oct 2026
Expected arrival ≈ 196 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 25 Jul 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.8%
stockout risk now 2%
Unit price
Rp 24.7M
PO history
ML early warning: 47% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 406 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 666.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 6 functional locations
5 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FCV-1395 HE-275C OUTLET FLOW | A | 1 | 0 | 0.11 |
| PX_FCV-665 VD-339 OUTLET FLOW | B | 1 | 2 | 0.54 |
| PX_TCV-1379 PP-1144B TEMP CONTROL | B | 1 | 2 | 0.12 |
| PX_FCV-1931 BY PASS LINE | B | 1 | 1 | 0.11 |
| PX_LCV-965 LEVEL CONTROL VALVE | B | 1 | 0 | 0.12 |
| PX_PCV-577 PRESSURE CONTROL VALVE | C | 2 | 0 | 0.08 |
Lead time and procurement
Lead time 196 ± 83 days (PO history + category, 1 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Sept 2026 | PR06 Regular replenishment | 1 | Rp 24.7M | 25 Jul 2027 open | 308 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 May 2026 | Low | PX_FCV-665 | FCV-665; valve hunting |
| 28 Jan 2026 | Low | PX_TCV-1379 | Install scaffolding at TCV-1379 |
| 31 May 2025 | Low | PX_FCV-1931 | FCV-1931; small leak at packing |
| 25 May 2025 | Low | PX_FCV-665 | Repair insulation FCV-665 |
| 18 May 2025 | Low | PX_TCV-1379 | TCV-1379 passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Aug 2025 | 1 | 201000010238 | Corrective |