Sparely
DU

TRIM SET,CONTROL VALVE,MODEL AS800,GRAPH

Material 4100043590 · TRIM SET · Plant 1000

BReorderCriticalStockout
Material
4100043590
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
B (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
159 d · P80 236 d
Unit price
Rp 78.5M (est.)

Recommendation

  • 1.Forecast 0.3 SET/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~159 days; expected demand during lead time 0.1.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 157.0M · order by 01 Oct 2026
Expected arrival ≈ 159 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.1%
stockout risk now 13%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 129.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.

Installed on 4 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-804
CONTROL VALVE
B200.11
PX_LCV-1098
LEVEL CONTROL VALVE
B100.12
PX_PCV-1956A
HE-1483A PRESSURE CONTROL
C100.08
PX_LCV-1004B
HE-1903 LEVEL CONTROL
S110.12

Lead time and procurement

Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 May 2025HighPX_LCV-1004B[MSI-B-25-XWG-186] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
19 Jan 20261201000037354Corrective