TRIM SET,CONTROL VALVE,TYPE NL545,CS

Material 4100043675 · TRIM SET · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100043675
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
A (3 of 7 FuncLocs A/B)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
149 d · P80 236 d
Unit price
Rp 80.5M

Recommendation

  • 1.Forecast 0.7 SET/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~149 days; expected demand during lead time 0.3.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 241.6M · order by 01 Oct 2026
Expected arrival ≈ 149 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.7%
stockout risk now 25%
Unit price
Rp 80.5M
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 274 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 7 functional locations

3 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1324
BY PASS LINE
A100.11
PX_PCV-1988
PP-1011D PRESSURE CONTROL
A100.08
PX_TCV-529
TEMPERATURE CONTROL VALVE
B400.12
PX_TCV-639
HE-1500B TEMP CONTROL
C120.55
PX_LCV-492
HE-337B LEVEL CONTROL
C100.12
PX_TCV-727D
HE-1305 TEMP CONTROL
C100.12
PX_FCV-273
CONTROL VALVE
S100.11

Lead time and procurement

Lead time 149 ± 83 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
14 Jun 2025PR03
Regular replenishment
1Rp 80.5M11 Oct 2025119 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Dec 2025MediumPX_TCV-639TCV-639; small leak at packing
07 May 2025MediumPX_TCV-639TCV-639; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
31 Dec 20251204000003453Preventive
17 Aug 20251201000013787Corrective