TRIM SET,CONTROL VALVE,MODEL QN855,PTFE

Material 4100043683 · TRIM SET · Plant 1000

AReorderNormalSlow-moving
Material
4100043683
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
159 d · P80 236 d
Unit price
Rp 78.5M (est.)

Recommendation

  • 1.Forecast 1.5 SET/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~159 days; expected demand during lead time 0.6.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 392.5M · order by 01 Oct 2026
Expected arrival ≈ 159 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.6%
stockout risk now 27%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 219 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 7 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1224
BY PASS LINE
A300.11
PX_TCV-1540
TEMPERATURE CONTROL VALVE
B110.12
PX_PCV-204
PP-588 PRESSURE CONTROL
B100.08
PX_PCV-403
HE-492C PRESSURE CONTROL
B100.08
PX_FCV-1243A
BY PASS LINE
C100.11
PX_FCV-1768
CONTROL VALVE
C100.11
PX_FCV-431
DILUTION STEAM FLOW CONTROL
C100.11

Lead time and procurement

Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 May 2025MediumPX_TCV-1540PSM25/Overhaul TCV-1540

Recent goods issues

Posting dateQtyOrderOrder type
24 Feb 20262204000028926Preventive
05 Nov 20252201000031022Corrective