TRIM SET,CONTROL VALVE,SIZE FD38,NBR
Material 4100043742 · TRIM SET · Plant 1000
ALong-leadMonitorTAM reserve
- Material
- 4100043742
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 137 d · P80 132 d
- Unit price
- Rp 91.9M
Recommendation
- 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~137 days; expected demand during lead time 0.0.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Used only during the last turnaround (1 SET): keep it for the next one instead of treating it as slow-moving.
- 5.Long lead time: 80% of deliveries took up to 132 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Long-leadLast turnaround used 1Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 91.9M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 20.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1772 HE-1578 LEVEL CONTROL | A | 1 | 0 | 0.12 |
| PX_PCV-1496A PP-821 PRESSURE CONTROL | A | 1 | 0 | 0.08 |
| PX_TCV-293 TEMPERATURE CONTROL VALVE | A | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 137 ± 59 days (PO history, 3 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Feb 2026 | PR06 Regular replenishment | 2 | Rp 94.4M | 19 May 2026 | 97 d |
| 02 Nov 2025 | PR03 Regular replenishment | 1 | Rp 91.9M | 04 Feb 2026 | 94 d |
| 10 Sept 2025 | PR03 Regular replenishment | 1 | Rp 91.0M | 12 Feb 2026 | 155 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Dec 2025 | 1 | 203000016277 | Turnaround |