TRIM SET,CONTROL VALVE,SIZE FD38,NBR

Material 4100043742 · TRIM SET · Plant 1000

ALong-leadMonitorTAM reserve
Material
4100043742
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
137 d · P80 132 d
Unit price
Rp 91.9M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~137 days; expected demand during lead time 0.0.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Used only during the last turnaround (1 SET): keep it for the next one instead of treating it as slow-moving.
  • 5.Long lead time: 80% of deliveries took up to 132 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Long-leadLast turnaround used 1Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 91.9M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 20.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1772
HE-1578 LEVEL CONTROL
A100.12
PX_PCV-1496A
PP-821 PRESSURE CONTROL
A100.08
PX_TCV-293
TEMPERATURE CONTROL VALVE
A100.12

Lead time and procurement

Lead time 137 ± 59 days (PO history, 3 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
11 Feb 2026PR06
Regular replenishment
2Rp 94.4M19 May 202697 d
02 Nov 2025PR03
Regular replenishment
1Rp 91.9M04 Feb 202694 d
10 Sept 2025PR03
Regular replenishment
1Rp 91.0M12 Feb 2026155 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
25 Dec 20251203000016277Turnaround