TRIM SET,CONTROL VALVE,SIZE FX406,CS
Material 4100043754 · TRIM SET · Plant 1000
CMaintainNo stock needed
- Material
- 4100043754
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 160 d · P80 183 d
- Unit price
- Rp 181.4M
Recommendation
- 1.Forecast 0.4 SET/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~160 days; expected demand during lead time 0.2.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Convert to Non StockSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 15%
Unit price
Rp 181.4M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 146 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 11.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-1012A TEMPERATURE CONTROL VALVE | C | 1 | 1 | 0.12 |
| PX_FCV-876 QUENCH WATER FLOW CONTROL | C | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 160 ± 58 days (PO history, 4 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 18 Apr 2026 | PR03 Regular replenishment | 2 | Rp 177.6M | 29 Aug 2026 | 133 d |
| 02 Apr 2026 | PR06 Regular replenishment | 2 | Rp 189.2M | 09 Sept 2026 | 160 d |
| 08 Aug 2025 | PR03 Regular replenishment | 2 | Rp 182.5M | 13 Mar 2026 | 217 d |
| 01 Jul 2025 | PR06 Regular replenishment | 2 | Rp 180.3M | 11 Nov 2025 | 133 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 May 2025 | High | PX_TCV-1012A | TCV-1012A passing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 May 2026 | 1 | 201000019580 | Corrective |