TRIM SET,CONTROL VALVE,TYPE QO725,VITON
Material 4100043783 · TRIM SET · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100043783
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 203 d · P80 236 d
- Unit price
- Rp 33.4M
Recommendation
- 1.Forecast 1.6 SET/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~203 days; expected demand during lead time 0.9.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 100.2M · order by 01 Oct 2026
Expected arrival ≈ 203 days
Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.5%
stockout risk now 3%
Unit price
Rp 33.4M
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 167 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1454 PRESSURE CONTROL VALVE | A | 1 | 0 | 0.08 |
| PX_FCV-1753 BY PASS LINE | B | 1 | 0 | 0.11 |
| PX_TCV-734A TEMPERATURE CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 203 ± 83 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Jul 2025 | PR01 Import / long-lead | 2 | Rp 33.4M | 28 Jun 2026 | 334 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Apr 2026 | 2 | 201000022069 | Corrective |
| 25 Dec 2025 | 1 | 201000030056 | Corrective |
| 24 Dec 2025 | 1 | 201000030056 | Corrective |