TRIM SET,CONTROL VALVE,SIZE QB469,SS316
Material 4100043870 · TRIM SET · Plant 1000
CReduceExcess
- Material
- 4100043870
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 159 d · P80 236 d
- Unit price
- Rp 78.5M (est.)
Recommendation
- 1.Forecast 1.1 SET/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~159 days; expected demand during lead time 0.5.
- 3.A 91.2% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 15 exceeds the level to keep (2) by 13.
Price estimatedLead time estimated
On hand / on order
15 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
91.2%
stockout risk now 0%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 129 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 35.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_TCV-441A HE-275C TEMP CONTROL | C | 1 | 5 | 1.83 |
| PX_LCV-845 LEVEL CONTROL VALVE | C | 1 | 2 | 0.97 |
Lead time and procurement
Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Sept 2026 | Low | PY_TCV-441A | Replace lamp as per PM finding |
| 18 May 2026 | Medium | PY_TCV-441A | Overhaul TCV-441A |
| 17 May 2026 | Low | PY_TCV-441A | Overhaul TCV-441A |
| 05 May 2026 | Low | PY_TCV-441A | TCV-441A stuck |
| 06 Nov 2025 | High | PX_LCV-845 | LCV-845; small leak at packing |
| 28 Jul 2025 | Medium | PX_LCV-845 | Replace lamp as per PM finding |
| 19 May 2025 | Low | PY_TCV-441A | TCV-441A; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 May 2026 | 1 | 201000012062 | Corrective |