TRIM SET,CONTROL VALVE,TYPE OO79,SS316
Material 4100043951 · TRIM SET · Plant 1000
CReorderHighStockout
- Material
- 4100043951
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 159 d · P80 236 d
- Unit price
- Rp 78.5M (est.)
Recommendation
- 1.Forecast 0.7 SET/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~159 days; expected demand during lead time 0.3.
- 3.A 73.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
Proposed purchase requisition
1 SET
Rp 78.5M · order by 01 Oct 2026
Expected arrival ≈ 159 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
73.5%
stockout risk now 27%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 83 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 22.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-745 PP-1161 TEMP CONTROL | C | 1 | 3 | 0.98 |
| PX_LCV-783 KC-575B LEVEL CONTROL | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Sept 2026 | Low | PX_TCV-745 | TCV-745; IA leak from regulator |
| 27 Jul 2026 | Medium | PX_TCV-745 | Install cover plate for MCP cracking |
| 22 Jul 2025 | Low | PX_TCV-745 | Install scaffolding at TCV-745 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jul 2026 | 1 | 201000013402 | Corrective |