Sparely
DU

TRIM SET,CONTROL VALVE,TYPE OO79,SS316

Material 4100043951 · TRIM SET · Plant 1000

CReorderHighStockout
Material
4100043951
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
159 d · P80 236 d
Unit price
Rp 78.5M (est.)

Recommendation

  • 1.Forecast 0.7 SET/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~159 days; expected demand during lead time 0.3.
  • 3.A 73.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
Proposed purchase requisition
1 SET
Rp 78.5M · order by 01 Oct 2026
Expected arrival ≈ 159 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
73.5%
stockout risk now 27%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 83 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 22.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-745
PP-1161 TEMP CONTROL
C130.98
PX_LCV-783
KC-575B LEVEL CONTROL
C100.12

Lead time and procurement

Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Sept 2026LowPX_TCV-745TCV-745; IA leak from regulator
27 Jul 2026MediumPX_TCV-745Install cover plate for MCP cracking
22 Jul 2025LowPX_TCV-745Install scaffolding at TCV-745

Recent goods issues

Posting dateQtyOrderOrder type
10 Jul 20261201000013402Corrective