TRIM SET,CONTROL VALVE,MODEL CH513,PTFE

Material 4100044174 · TRIM SET · Plant 1000

BLong-leadReduceSlow-moving
Material
4100044174
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
182 d · P80 217 d
Unit price
Rp 127.3M

Recommendation

  • 1.Forecast 0.3 SET/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~182 days; expected demand during lead time 0.1.
  • 3.A 87.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 3 exceeds the level to keep (1) by 2.
  • 5.Long lead time: 80% of deliveries took up to 217 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
3 / 2
next delivery 31 Dec 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
87.4%
stockout risk now 0%
Unit price
Rp 127.3M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 253 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 107.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.

Installed on 2 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1288
TEMPERATURE CONTROL VALVE
B200.12
PY_FCV-448
PP-992B OUTLET FLOW
C100.11

Lead time and procurement

Lead time 182 ± 54 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
06 Sept 2026PR05
Project / turnaround
1Rp 125.7M12 Mar 2027
open
187 d
12 May 2026PR06
Regular replenishment
1Rp 127.3M31 Dec 2026
open
233 d
14 Jan 2026PR03
Regular replenishment
1Rp 130.1M27 Jul 2026194 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
21 Jan 20261201000024144Corrective